home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V13_1 / V13_117.ZIP / V13_117
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/UbfuJki00WBw4Dtk4Q>;
  5.           Wed,  6 Feb 91 01:42:58 -0500 (EST)
  6. Message-ID: <YbfuJgC00WBw4Ds056@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Wed,  6 Feb 91 01:42:52 -0500 (EST)
  12. Subject: SPACE Digest V13 #117
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 117
  15.  
  16. Today's Topics:
  17.       Information sources for frequent space questions (1 of n)
  18.            Re: The edge of the solar system
  19.        Augustine recommendation for heavylift launcher
  20.            Re: The edge of the solar system
  21.               Re: some questions
  22.  
  23. Administrivia:
  24.  
  25.     Submissions to the SPACE Digest/sci.space should be mailed to
  26.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  27.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  28.              tm2b+@andrew.cmu.edu
  29.  
  30. ----------------------------------------------------------------------
  31.  
  32. Date: 1 Feb 91 12:01:42 GMT
  33. From: sdd.hp.com!elroy.jpl.nasa.gov!jarthur!nntp-server.caltech.edu!mustang!data.nas.nasa.gov!amelia!eugene@ucsd.edu  (Eugene N. Miya)
  34. Subject: Information sources for frequent space questions (1 of n)
  35.  
  36.  
  37. Many space activies center around large Government or International
  38. Bureaucracies.  In this country that means NASA.  If you have basic
  39. information requests: (e.g., general PR info, research grants, data,
  40. limited tours, and ESPECIALLY SUMMER EMPLOYMENT (typically resumes
  41. should be ready by Jan. 1), etc.), consider contacting the nearest
  42. NASA Center to answer your questions.
  43.  
  44. EMail typically will not get you any where, computers are used by
  45. investigators, not PR people.  The typical volume of mail per Center is
  46. a multiple of 10,000 letters a day.  Seek the Public Information Office
  47. at one of the below, this is their job:
  48.  
  49. NASA Headquarters (NASA HQ)
  50. Washington DC 20546
  51.  
  52. NASA Ames Research Center (ARC)
  53. Moffett Field, CA 94035
  54. [Mountain View, CA, near San Francisco Bay, you know Silicon Valley 8-) ]
  55.  
  56. NASA Ames Research Center
  57. Dryden Flight Research Facility [DFRF]
  58. P. O. Box 273
  59. Edwards, CA  93523
  60.  
  61. NASA Goddard Space Flight Center (GSFC)
  62. Greenbelt, MD 20771
  63. [Outside of Washington DC]
  64.  
  65. NASA Lewis Research Center (LeRC)
  66. 21000 Brookpark Rd.
  67. Cleveland, OH 44135
  68.  
  69. NASA Johnson Manned Space Center (JSC)
  70. Houston, TX 77058
  71.  
  72. NASA Kennedy Space Flight Center (KSC)
  73. Titusville, FL 32899
  74.  
  75. NASA Marshall Space Flight Center (MSFC)
  76. Huntsville, AL 35812
  77.  
  78. NASA Langley Research Center (LaRC)
  79. Hampton, VA 23665
  80. [Near Newport News, VA]
  81.  
  82. Not a NASA Center, but close enough:
  83. Jet Propulsion Laboratory [JPL/CIT]
  84. California Institute of Technology
  85. 4800 Oak Grove Dr.
  86. Pasadena, CA 91109
  87.  
  88. There are other small facilities, but the above major Centers are set up
  89. to handle public information requests.  They can send you tons of information.
  90.  
  91. Specific requests for software must go thru COSMIC at the Univ. of Georgia,
  92. NASA's contracted software redistribution service.  You can reach them
  93. at cosmic@uga.bitnet.  If this gives you problems, tell me.
  94.  
  95. NOTE:  Foreign nationals requesting information must go through their
  96. Embassies in Washington DC.  These are facilities of the US Government
  97. and are regarded with some degree of economic sensitivity.
  98. Centers cannot directly return information without high Center approval.
  99. Allow at least 1 month for clearance.  This includes COSMIC.
  100.  
  101. EUROPEAN SPACE AGENCY        (O) 202/488-4158
  102. 955 L'Enfant Plaza S.W., Washington, D.C.  20024
  103.  
  104.  Arianespace Headquarters
  105.  Boulevard de l'Europe
  106.  B.P. 177
  107.  91006 Evry Cedex
  108.  France
  109.  
  110. ARIANESPACE, INC. (O) 202/728-9075
  111. 1747 Pennsylvania Avenue, NW, Suite 875, Washington, DC  20006
  112.  
  113. SPOT IMAGE CORPORATION           (FAX) 703/648-1813    (O) 703/620-2200
  114. 1857 Preston White Drive, Reston, VA 22091
  115.  
  116. National Space Development Agency (NASDA), 4-1 Hamamatsu-Cho, 2 Chome
  117.           Minato-Ku, Tokyo 105, Japan
  118.  
  119. SOYUZKARTA
  120. 45 Vologradsij Pr., Moscow 109125, USSR
  121.  
  122. SPACE COMMERCE CORPORATION (U.S. agent for Soviet launch services)
  123. 504 Pluto Drive, Colorado Springs, CO  80906   (O) 719/578-5490
  124. 69th flr, Texas Commerce Tower, Houston, TX 77002  (O) 713/227-9000
  125.  
  126. Additionally information is frequent asked about:
  127. Space camp:
  128.  
  129.         Alabama Space and Rocket Center
  130.         1 Tranquility Base
  131.         Huntsville, AL 35805
  132.         205-837-3400
  133.  
  134.     U.S. SPACE CAMP
  135.     6225 Vectorspace Blvd
  136.     Titusville FL  32780
  137.     (407)267-3184
  138.     (registration and mailing list are handled through Huntsville --
  139.      both camps are described in the same brochure)
  140.  
  141. There is talk of a space camp to be located next to NASA Ames.
  142. Watch that space.
  143.  
  144.     "It's not a message.  I think it's a warning." -- Ripley
  145.  
  146. ------------------------------
  147.  
  148. Return-path: <space-request+@andrew.cmu.edu>
  149. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  150. Date: 31 Jan 91 18:55:36 GMT
  151. From: van-bc!rsoft!mindlink!a684@ucbvax.Berkeley.EDU  (Nick Janow)
  152. Organization: MIND LINK! - British Columbia, Canada
  153. Subject: Re: The edge of the solar system
  154. Sender: space-request@andrew.cmu.edu
  155. To: space@andrew.cmu.edu
  156.  
  157.  
  158. That's a misleading subject line.  It gives the impression that there is a
  159. clearly defined "edge" to the solar system, while in fact any boundaries are
  160. probably very vague.
  161.  
  162. What defines the "edge"?  Some level of gravity?  Some density of mass?  Some
  163. definitions may have our "edge" overlapping that of several nearby stars.  Who
  164. decides what the definition is?  :)
  165.  
  166. ------------------------------
  167.  
  168. Return-path: <space-request+@andrew.cmu.edu>
  169. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  170. Date: Fri, 1 Feb 91 21:18:25 EST
  171. From: John Roberts <roberts@cmr.ncsl.nist.gov>
  172. Organization: National Institute of Standards and Technology
  173.     formerly National Bureau of Standards
  174. Disclaimer: Opinions expressed are those of the sender
  175.     and do not reflect NIST policy or agreement.
  176. To: space@andrew.cmu.edu
  177. Subject: Augustine recommendation for heavylift launcher
  178.  
  179.  
  180. >Date: Mon, 21 Jan 91 09:42:30 -0500
  181. >From: "Allen W. Sherzer" <aws@iti.org>
  182. >Subject: One Small Step for a Space Activist... (vol 2 no 1)
  183.  
  184. >                  One Small Step for a Space Activist...
  185. >                                      by
  186. >                            Allen Sherzer & Tim Kyger
  187.  
  188. >...
  189. >1. New heavy Lift Vehicle (HLV). The Augustine committee advocated reduced
  190. >reliance on the Shuttle and the construction of a new HLV. This could reduce
  191. >costs and free up money for other projects. The current favorite (gets the
  192. >most hype and has strong Senate support) is Shuttle-C or some variant. Shuttle
  193. >C would work but may not be the best choice: other alternatives (Heavy Lift
  194. >Delta and Titan V) may cost less than half as much to develop and operate.
  195. >Activists will need to monitor this to insure that the design meets space
  196. >development goals and not Congressional political goals. Whatever design is
  197. >selected, we also need to insure that the resulting launcher is man rated
  198. >(which is supported by the committee).
  199.  
  200. >Allen Sherzer: (313) 769-4108 (work) (313) 973-0941 (home) aws@iti.org (net)
  201. >Tim Kyger: (202) 225-2415 (work) (703) 548-1664 (home)
  202.  
  203. I saw the Augustine Committee's testimony before the US House of
  204. Representatives on C-SPAN:
  205.  
  206. The Committee laid forth a set of requirements for an expendable launcher
  207. suitable for use in major undertakings such as space station assembly,
  208. Moon/Mars missions, launch of large satellites, etc. Part of its function
  209. would be to take over much or possibly eventually all of the functions
  210. of the current Shuttle. Among the desirable features are lowered cost
  211. per pound, higher reliability, greater ability to launch on schedule,
  212. adaptability to several forms with different abilities, and ability to
  213. be man-rated. It seemed to be understood that the government would help
  214. to finance development, and that the developed boosters would be 
  215. manufactured commercially. Because of the importance of expediting
  216. development, these costs would be fairly high, so at least at first
  217. there wouldn't be much saving over continued use of the Shuttle, though
  218. that could change later.  Though the Committee did not specify a
  219. particular design, the two approaches that seemed to receive the most
  220. attention were some variant of ALS or Shuttle-C. The arguments given were
  221. roughly as follows:
  222.  
  223. Shuttle-C - Many components of the current Shuttle (STS) are used to make
  224. an unmanned vehicle with payload greater than(?) the manned Shuttle.
  225. Because of the heavy use of current technology, development time could be
  226. fairly short - possibly only 4 or 5 years. The Shuttle-C concept can be
  227. expanded somewhat, but not so far as to specify all the goals listed by
  228. the Augustine Committee (i.e. man-rating). There is mention of gradually
  229. phasing in new components, once it's operating, but it is not clear that this
  230. can be done to any great extent.
  231.  
  232. Advanced Launch System (ALS) - In order to get past the "missile design"
  233. mentality that was the basis for current ELVs, ALS uses a large amount of
  234. new design, with the goal of producing an inexpensive, reliable heavy
  235. launcher. Very wide safety margins and tolerances are used, which reduces
  236. performance slightly compared to a high-performance system such as the
  237. Shuttle, but the reduced need for exhaustive testing, extreme care, etc.
  238. should more than make up for the cost of the additional fuel expended.
  239. With this and a rigid methodology governing payload attachment and launch
  240. techniques, it is hoped that there will eventually be large reductions in
  241. launch costs and in time to prepare and launch. A wide range of configurations
  242. should be available, and human-rating is an eventual possibility.
  243. Estimated time to full implementation and commercial manufacture is
  244. around 8-10 years.
  245.  
  246. In addition to the Augustine Committee testimony, I heard presentations at
  247. the NIST-hosted conference on reducing the cost of space infrastructure
  248. a year or so back. (That was a good conference - among other things many
  249. launch techniques were discussed, including a good presentation on laser
  250. launchers by Jordin Kare. :-)  For the two launchers in question, the
  251. following additional points were brought up:
  252.  
  253.   - Shuttle-C is not expected to bring about any per-pound cost savings over
  254.     continued use of the Shuttle, either in the near-term or the far-term -
  255.     the whole intent of the program is to get an increased total national
  256.     payload capacity soon. By contrast, a goal of ALS is to get costs
  257.     down to about $500 per pound of payload to orbit, or about a tenth of
  258.     typical current costs. (Many proposed launchers offer varying savings,
  259.     but this one actually sounds almost plausible, given that such savings
  260.     would not appear right away due to relatively high design costs.)
  261.  
  262.   - There is some advantage in having a variety of designs in use so that
  263.     the discovery of one flaw does not ground the entire fleet. A problem
  264.     grounding the Shuttle fleet could also ground the Shuttle-C launchers
  265.     because of the many components they have in common.
  266.  
  267.   - The estimate for launch costs on Shuttle-C not being particularly higher
  268.     than on the Shuttle is based partly on the presumption that the SSMEs
  269.     used (and discarded) on each Shuttle-C flight will be old retired
  270.     engines from Shuttles. (As Henry has said, the SSME is just too expensive
  271.     to burn up brand new ones on expendable launchers.) The result of this
  272.     requirement is that for Shuttle-C to remain "competitive", the regular
  273.     Shuttle must keep flying, and in fact there must be many Shuttle launches
  274.     for each Shuttle-C launch.
  275.  
  276.   - To allow for various ALS payload requirements, boosters (with diameter 
  277.     close to the diameter of the ALS body can be strapped on. Allowed
  278.     configurations include 4 boosters, or 2, or 1 (!) (A vertical rocket
  279.     with a booster on just one side looks very strange - presumably the
  280.     nozzles have to swivel to balance the thrust.)
  281.  
  282. Congress is going to be debating whether to fund Shuttle-C, ALS, both,
  283. or neither. Funding both may turn out to be too expensive, so it may be
  284. necessary to make a choice. ALS appears to have much greater potential
  285. for the future, but will take a while to get ready. Shuttle-C would be
  286. ready sooner, but it was designed largely with rapid deployment of SDI
  287. hardware in mind, and doesn't offer much beyond an increase in total
  288. national payload capacity, and increased maximum single payload. The
  289. question then seems to be whether getting a new launcher sooner is worth
  290. giving up other possible future benefits.
  291.  
  292. I would offer the speculation that:
  293.  - SDIO doesn't seem to be planning to launch large quantities of anything
  294.    anytime soon.
  295.  - New projects are unlikely to commit to a new launcher until it has actually
  296.    been built and demonstrated to work. In particular, for a space station
  297.    timetable, waiting around for development of Shuttle-C or ALS would add
  298.    another large delay before the start of construction. It will probably be
  299.    quicker to build a station using existing launchers (Shuttle or expendable)
  300.    or ones which are already far along in development. For tending the
  301.    station after assembly, and for possible expansion, whatever new launchers
  302.    have been developed by that time can be used. 
  303.  
  304. Disclaimers:
  305.  - I haven't said much about the proposed new Delta and Titan launchers
  306.    because I don't know much about them - Allen can provide a lot more
  307.    information. I don't see why several types of launcher couldn't be 
  308.    developed and used together - especially if some of them are developed
  309.    either partially or completely with private funding. There are many
  310.    possible market niches for different sizes and types of launchers.
  311.  
  312.  - My machine may have dropped the automatic Official Disclaimer. Of course
  313.    it applies to all of my messages, whether it is included or not.
  314.      John Roberts
  315.      roberts@cmr.ncsl.nist.gov
  316.  
  317. ------------------------------
  318.  
  319. Return-path: <space-request+@andrew.cmu.edu>
  320. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  321. Date: 1 Feb 91 18:20:50 GMT
  322. From: sdd.hp.com!samsung!rex!rouge!dlbres10@ucsd.edu  (Fraering Philip)
  323. Organization: Univ. of Southwestern LA, Lafayette
  324. Subject: Re: The edge of the solar system
  325. References: <188.27A94707@nss.FIDONET.ORG>
  326. Sender: space-request@andrew.cmu.edu
  327. To: space@andrew.cmu.edu
  328.  
  329. In article <188.27A94707@nss.FIDONET.ORG> Paul.Blase@nss.FIDONET.ORG (Paul Blase) writes:
  330.  
  331. JC>         This is also noted in John Brandt's article on comets
  332. JC>  in "The New Solar System" (228) who discusses Jan Oort's
  333. JC>  conclusion that the "overwhelming majority of comets reside in
  334. JC>  an essentially spherical cloud around the Sun with a radius of
  335. JC>  perhaps 20,000 to 100,000 AU. (By comparison, the nearest srs
  336. JC>  to the solar system, the Alphaha Centauri System, are some
  337. JC>  275,000 AU distant.)"
  338.  
  339. According to Wednesday's lecture by Dr. Matese, the dominant
  340. characteristic of the Oort cloud is that it is heavily influenced
  341. by the galaxy's tidal pull and the passing of nearby stars.
  342.  
  343. Comets in the Oort cloud are definately _not_ stable over the lifetime
  344. of the solar system. It is thought that most comets reside in a belt
  345. closer to Neptune called the Kuiper belt.
  346.  
  347. I don't think Dr. van Oort made the assertion that most comets resided
  348. in the Oort cloud. It is just the major source of short-period comets,
  349. due to the fact that they are easily disturbed from their orbits and
  350. sent down into the inner solar system (or into the outer solar system, 
  351. where they come under the gravitational influence of Jupiter or Saturn,
  352. which modifies their trajectory even more...)
  353.  
  354. Phil Fraering
  355. dlbres10@pc.usl.edu
  356.  
  357. ------------------------------
  358.  
  359. Return-path: <space-request+@andrew.cmu.edu>
  360. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  361. Date: 30 Jan 91 19:06:20 GMT
  362. From: sdd.hp.com!zaphod.mps.ohio-state.edu!unix.cis.pitt.edu!pitt!nss!Paul.Blase@ucsd.edu  (Paul Blase)
  363. Organization: The NSS BBS, Pittsburgh PA (412) 366-5208
  364. Subject: Re: some questions
  365. Sender: space-request@andrew.cmu.edu
  366. To: space@andrew.cmu.edu
  367.  
  368. >> 3) Which are the Pioneers/Voyagers that have left the Solar
  369. >> Syatem?
  370.  
  371.  CC> The ones that passed the "Last Chance Saloon", just beyond
  372.  CC> Pluto!
  373.  
  374.  CC> Seriously, how do you define "the Solar System".  There is a
  375.  CC> plausible basis for saying that when you cross the heliopause,
  376.  CC> you have "left the Solar System", but I don't believe any have
  377.  CC> done so yet. --
  378.  
  379. the edge of the solar system is more-or less defined as the outermost
  380. planet (currently Neptune, I believe).  One of the things that the
  381. Voyager probes are looking for now is the heliopause.
  382.  
  383. --- via Silver Xpress V2.26 [NR]
  384. --  
  385. Paul Blase - via FidoNet node 1:129/104
  386. UUCP: ...!pitt!nss!Paul.Blase
  387. INTERNET: Paul.Blase@nss.FIDONET.ORG
  388.  
  389. ------------------------------
  390.  
  391. End of SPACE Digest V13 #117
  392. *******************
  393.